Featured project
GLASS BOTTLE FACTORY EXPANSION, RENGO PLANT
Industrial Sector
Manufacturing
Client
Verallia
Location
Rengo, VI Region
Date
2018-2020
Service Area
EPCM contract
Solutions
Basic engineering, Capex estimation, project scheduling, detailed engineering in mechanical, piping, civil, structural and electrical; architecture, BIM modelling, procurement management and project administration services.
Verallia, considered a world leader in the glass packaging sectors for wines, spirits and food, produces more than 16,000 million containers each year for its more than 10,000 customers around the world. In Chile, the company produces glass bottles to serve mainly the wine industry, using the latest technology available in the manufacture of glass containers in its modern plant located in Rengo.
In order to maintain this leadership, Verallia decided to modernize its factory, which was enabled to produce 240 tons of molten glass per day through the operation of a melting furnace and 2 production lines with 120 tons/day of processing capacity each.
The constructed area of the factory was 4.7 ha, due to the fact that in recent years a Liquefied Natural Gas (LNG) tank was implemented that occupies an area of 525 m2, a treatment plant of “cullet” or calcín (glass from recycling) that occupies an area of approximately 591 m2.
The project carried out by Pa Engineering contemplated increasing the production capacity of the factory to total 405 tons/day of molten glass, for which the replacement of the current furnace was considered, because it fulfilled its useful life, with a new one that allowed the integration of the largest amount of molten glass, and the incorporation of a new production line of 165 tons/day.
To carry out this work, the building where the production is carried out was expanded, which also houses the new melting furnace and the new production line, plus an electrical room to supply the energy demand of the new facilities.
In addition, in the EPCM development, due to the increase in processing capacity at the factory, the expansion and modification of some of the existing facilities was contemplated, such as the finished product warehouse, truck loading yard, cullet tanks, process water plant, LNG storage area and parking lots.
An important point to note is that while the project was being developed, the production process never stopped, consequently, once the new furnace was implemented, the operation of the old furnace was deactivated. Achieving the above requires great planning and coordination of the entire team of specialists from the conception of the project to carry out the designs and define the construction sequence without altering the normal operation of the plant or risking the safety of the workers.
The project carried out by PA Engineering contemplated increasing the production capacity of the factory to total 405 tons/day of molten glass, for which the replacement of the current furnace was considered, because it fulfilled its useful life, with a new one that allowed the integration of the largest amount of molten glass, and the incorporation of a new production line of 165 tons/day.
To carry out this work, the building where the production is carried out was expanded, which also houses the new melting furnace and the new production line, plus an electrical room to supply the energy demand of the new facilities.
In addition, in the EPCM development, due to the increase in processing capacity at the factory, the expansion and modification of some of the existing facilities was contemplated, such as the finished product warehouse, truck loading yard, cullet tanks, process water plant, LNG storage area and parking lots. An important point to note is that while the project was being developed, the production process never stopped, consequently, once the new furnace was implemented, the operation of the old furnace was deactivated. Achieving the above requires great planning and coordination of the entire team of specialists from the conception of the project to carry out the designs and define the construction sequence without altering the normal operation of the plant or risking the safety of the workers.
Other News
Featured project
INCREASE IN PRODUCTION RATE AT THE CAROLA MINE
Featured project
Pit Dewatering
Featured project
Study of transportation alternatives “Magallanes Winds”
Featured project
Standardization of the plant's anti-incident system
Featured project
WATER INFRASTRUCTURE FOR OVER 210,000 PEOPLE IN ATACAMA