The transformation of the energy matrix driven by decarbonisation goals has brought challenges for the industry. PA Engineering has the experience to develop projects such as wind and solar farms, construction and expansion of substations and high voltage lines, engineering for geothermal plants, hydrogen, E-fuels and methanol, among others. Our solutions offer efficient and safe projects, which aim to help our clients reduce greenhouse gas emissions.

Energy

Study of transportation alternatives “Magallanes Winds”

Study of transportation alternatives “Magallanes Winds”

Industrial Sector


Energy

Client


RWE Renewables

Location


Laguna Blanca Commune, Punta Arenas

Date


2023

Service Area


Consulting

Solutions


Trade-off study

RWE Renewables Chile is developing the Vientos Magallánicos project, a plant that seeks to produce green hydrogen and ammonia through a wind farm, which would be located near Villa Tehuelches, Laguna Blanca, about 100 km northwest of Punta Arenas.

The wind farm would have an installed capacity of approximately 1 GW and estimates an annual production of 475,000 tons of green ammonia to be exported to international markets.

In this context, PA Engineering carried out a Trade-Off study on transportation alternatives to the different ports in the area, evaluating the possibility of transporting electricity, green hydrogen or ammonia. The analysis included the definition of transportation requirements, equipment, surface area in Laguna Blanca and in port, possible routes based on a regulatory analysis and identification of singularities and the estimation of CAPEX and OPEX.

PtX E-Fuel Project, Haru Oni Demonstration Plant

PtX E-Fuel Project, Haru Oni Demonstration Plant

Industrial Sector


Energy

Client


HIF

Location


Punta Arenas, MAgallanes Region

Date


2021-2022

Service Area


Consulting, Engineering & Environment

Solutions


Processing of the EIS and Balance of Plant (BOP) engineering for the methanol-to-gasoline conversion process.

With the aim of accelerating the committed decarbonization, HIF set out to develop the first demonstration plant to generate E-Methanol and E-Gasoline from carbon dioxide (CO2) from the air and hydrogen (H2) from water, including a wind turbine, an electrolyzer for hydrogen generation, CO2 capture, methanol synthesis, the Methanol-to-Gasoline (MtG) process and the entire balance of plant (BOP) in the Magallanes Region.  Chile.

HIF built the Haru Oni demonstration plant. This is one of the first projects of its kind in the world. The plant obtains green hydrogen from water based on an electrolyzer powered by wind energy; then, the hydrogen is combined with CO2 captured from the atmosphere and through a synthesis process methanol is produced. The methanol produced is treated and then transformed into E-Fuel (MtG process), including carbon-neutral gasoline and carbon-neutral liquefied gas. These E-Fuels cement the way for existing infrastructure to be carbon neutral, through the continuous reuse of CO2.

PA Engineering developed the BOP engineering of the MtG Plant, performing the basic and detailed engineering in mechanical, piping, structural, electrical and instrumental and control necessary to complete the MtG System, including the MtG unit building, the Tank Farm, the electrical power system, the interconnections with the methanol plant,  truck loading systems and facilities for other supplies from the MtG and Tank Farm areas.

Tolpán Sur Wind Farm

Tolpán Sur Wind Farm

Industrial Sector


Energy

Client


Acciona Chile

Location


Renaico, Araucanía Region.

Date


2018-2019

Service Area


Engineering

Solutions


Detailed engineering for civil works and medium voltage electrical detail engineering and support engineering service for the construction of the San Gabriel Wind Farm.

The wind farms will have a combined capacity of 267 megawatts. The most advanced is San Gabriel, which will be made up of 61 AW132/3000 wind turbines, with 3 MW of nominal power, each wind turbine will mount a rotor of 132 meters in diameter on a concrete tower with a hub height of 120 meters, reinforced with anti-seismic technology.

The Tolpán Sur wind farm will have an 84 MW installation, made up of 28 turbines like those planned in San Gabriel. Both parks are expected to provide clean energy to about 407,000 homes. The Project is still under construction.

Energy Consumption Optimization

Energy Consumption Optimization

Industrial Sector


Food

Client


Orafti

Location


Pemuco, Bio Bio Region.

Date


2012-2013

Service Area


Consulting, Engineering & Procurement

Solutions


Conceptual engineering, basic engineering in process, mechanical, piping, and instrumentation specialties; detailed engineering in mechanical, piping, civil and structural, electrical, and instrumentation and control specialties; technical support in construction bidding and assembly supervision

Orafti Chile commissioned a study of energy consumption optimization to the engineering office of its parent company in Germany. The objective of this study was to reduce the thermal energy consumption of the plant.

The project to reduce the energy consumption of its Inulin production plant began with the conceptual engineering study carried out by PA Engineering. The project included the piping to interconnect the new equipment and the replacement of existing lines, either due to hydraulic or material requirements. Then, basic and detailed engineering was carried out, which included modifications and new installations, the arrangement of evaporators, modifications to existing ones, installation of heat exchangers and transformation of existing ones, installation of pumps and tanks, assembly and/or modification of piping circuits, among others.

Cerro Pabellón 3 Geothermal Plant

Cerro Pabellón 3 Geothermal Plant

Industrial Sector


Energy

Client


Enel Green Power

Location


Atacama Desert, Ollagüe, Antofagasta Region

Date


2018-2019

Service Area


Engineering

Solutions


Gathering System Detail Engineering

Built by Geotérmica del Norte – GDN, a joint venture between Enel Green Power Chile and ENAP, the plant, which uses high-enthalpy binary cycle technology, is the only geothermal plant in operation in South America and the highest of its kind in the world, as it is located at 4,500 meters above sea level.

This plant has two units with a installed capacity of 24 MW each for a total capacity of 48 MW and Enel is currently developing part 3 of the project, which is the installation of a third unit. In full operation, Cerro Pabellón is expected to be capable of producing around 340 GWh per year, which is equivalent to the annual consumption needs of more than 165,000 Chilean households, avoiding the emission of more than 166,000 tons of CO2 into the atmosphere each year.

PA Engineering developed the Gathering System Detail Engineering of Cerro Pabellón 3, with scope of the structural, electrical and instrumental civil disciplines and control. The third unit is expected to come into operation in 2021, as reported by Enel Greenpower on its website.

SOLAR FIELD “LUZ DEL NORTE”

SOLAR FIELD “LUZ DEL NORTE”

Industrial Sector


Energy

Client


First Solar

Location


Carrera Pinto sector, near Copiapó, Atacama Region

Date


2013-2014

Service Area


Environment, Engineering & Procurement

Solutions


Processing of environmental permits, rescue and relocation of fauna, permanent archaeological monitoring, detailed engineering, procurement management, inspection and supervision of construction.

The Luz del Norte project is a solar photovoltaic (PV) power in 478 hectares of land, diversifying Chile’s energy portfolio.

The 141 megawatt (MW) alternating current project is powered by more than 1.7 million First Solar advanced thin-film PV modules, which produce enough solar energy to power 174,000 homes and displace the equivalent of more than 185,000 metric tons of CO2 emissions per year.

Grouped into four subsectors or PVCS units, each of these four PVCS units was connected to the substation considered in the project through a 23 kV collector. This new substation collects the plant’s 162 MW and connects it to the nearest existing substation in the system.

COAL YARD ROOF COVERING BOCAMINA POWER PLANT

COAL YARD ROOF COVERING BOCAMINA POWER PLANT

Industrial Sector


Energy

Client


Enel

Location


Coronel, Biobío Region

Date


2015-2016

Service Area


Engineering, Project Management and EPC contract.

Solutions


Basic engineering, details and EPC contract (EISI).

The project considered basic and detailed engineering, supplies, construction of civil works, manufacture and assembly of geodesic dome-type metal structures to specify the coverage of the court, which has multiple characteristics such as being self-supporting, light and allows it to adapt to the geometry of the terrain. This particularity makes the construction fast and similar to a large puzzle that is assembled by technical teams throughout the coverage area, without the use of cranes.

Once the structure was completed, a base cover of ribbed metal sheets was laid, similar to those used in industrial buildings. The project covered an area of 45,000 m2.

WIND FARM CABO NEGRO, 3MW

WIND FARM CABO NEGRO, 3MW

Industrial Sector


Energy

Client


Methanex

Location


Punta Arenas, Magallanes Region

Date


2008-2009

Service Area


Engineering

Solutions


Civil and electrical detail engineering.

In 2008, PA Engineering was invited to participate in the development of the civil detail engineering, with the aim of designing the foundations required to support the 3 wind turbines that the wind farm will have. Then, the client requested the electrical detail engineering for the construction of the medium voltage line that connects the wind generators with the plant.

With the groundbreaking ceremony on December 11, 2009, this Bicentennial project began, which was inaugurated in October 2010 and involved a direct investment of US$ 5.3 million.

The wind farm included the construction of three wind turbines with a combined capacity of 2.55 MW, which supplied electricity to the Methanex facilities, from wind, and thus reduce CO2 emissions by 12,129 tonnes.

Expansion S/E Curacautín

Expansion S/E Curacautín

Industrial Sector


Energy

Client


CGE Transmisión

Location


Curacautín, Malleco Province, Araucanía Region

Date


2022

Service Area


Project Management

Solutions


Team - PMO, which includes planning and control, contract management, document control, counterparty and on-site engineering and environmental consulting

The project consisted of the replacement of the two 66/13.2 kV and 2.6 MVA transformers with a new 15 MVA equipment. It included the reuse of existing equipment, the extension of the 66 kV busbar, an extension of the 13.2 kV busbar in at least two positions for future feeders and the necessary civil works. It also included the necessary works for the Commissioning, such as adaptation of the protections, SCADA, civil works, assembly, earthing mesh, tests of the new equipment, and adaptations in the medium voltage yard, among others.

PA Engineering established the management team of this project through a management PMO to ensure its proper development. The work of the PMO that took charge of the project ranged from its basic and detailed engineering stage, obtaining building permits, environmental permits, supplies, construction and assembly, Commissioning and until the Entry into Operation of the new facility, which was achieved on August 25, 2022.

Colbún Santa María Central Seawater System

Colbún Santa María Central Seawater System

Industrial Sector


Energy

Client


Maire Tecnimont

Location


Port of Coronel, on the coast of the Biobío Region of Chile

Date


2009

Service Area


Engineering & Procurement

Solutions


Detailed engineering, procurement and inspection.

The coal power plant, with a gross rated power of 350 MW, uses pulverized bituminous coal as its main fuel. PA Engineering developed the detailed engineering in all disciplines for the seawater system of the new plant. This included the collection, treatment and impulsion to the plant and its return to the sea.

The seawater system, with a capacity of 50,000 m3/h, includes the water intake, siphon on the quay, pumping pit (14 x 45 x 18 m), seawater circuits to the plant and return circuits of 2 x 1,500 m in length for delivery at sea.

Improvements to the Ventanas Thermoelectric Complex

Improvements to the Ventanas Thermoelectric Complex

Industrial Sector


Energy

Client


Echeverría Izquierdo Montajes Industriales

Location


Puchuncaví, Valparaíso Region

Date


2014-2015

Service Area


Consulting and Engineering

Solutions


Basic process engineering, mechanical, electrical and instrumental, and detailed engineering in mechanics and piping, electrical, instrumental and control, civil and structural.

PA Engineering developed the basic and detail engineering for the improvement of the Instrumentation and Service Air System of Ventana 1 and Ventana 2. In addition, the engineering was done for a short-term solution in the use of water from ESVAL, for the replacement of the slag silo bucket elevator. 

Eléctrica Ventanas Company, a subsidiary of the AES Gener Group, operates the Nueva Ventanas thermoelectric, a plant that has an installed capacity of 272 MW that it injects into the Central Interconnected System (SIC). Nueva Ventanas has state-of-the-art technology to minimize its emissions into the atmosphere: semi-dry desulfurization (SDA) equipment for the reduction of sulfur dioxide (SO2) emissions; Bag Filter System that captures 99.9% of particulate matter (PM), and adjustable tangential carbon burners, which reduce the generation of Nitrogen Oxides (NOx).