Featured project
Tolpán Sur Wind Farm
Industrial Sector
Energy
Client
Acciona Chile
Location
Renaico, Araucanía Region.
Date
2018-2019
Service Area
Engineering
Solutions
Detailed engineering for civil works and medium voltage electrical detail engineering and support engineering service for the construction of the San Gabriel Wind Farm.
The wind farms will have a combined capacity of 267 megawatts. The most advanced is San Gabriel, which will be made up of 61 AW132/3000 wind turbines, with 3 MW of nominal power, each wind turbine will mount a rotor of 132 meters in diameter on a concrete tower with a hub height of 120 meters, reinforced with anti-seismic technology.
The Tolpán Sur wind farm will have an 84 MW installation, made up of 28 turbines like those planned in San Gabriel. Both parks are expected to provide clean energy to about 407,000 homes. The Project is still under construction.
Other News
Featured project
Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining
Featured project
Archaeological Rescue: Ñuble Regional Hospital Project
Featured project
Piuquenes Dam Repulping and PMFC Tailings Drive
Featured project
Aguas Pacífico Multipurpose Desalination Plant