Featured project

ENGINEERING FOR CHLORINATION PLANT – MOLYB PROJECT

6 of April of 2026

Industrial Sector


Mining

Client


Codelco VP

Location


Mejillones, Chile

Date


2014-2015

Service Area


Engineering

Solutions


Consulting, Engineering, Procurement Management, and Construction and Installation Management

Codelco developed the MOLYB project in Mejillones, Antofagasta Region, to add value to its molybdenum concentrates and produce commercial-grade molybdenum oxides within Chile. The project responded to growing global demand for high-purity molybdenum products used in steel, electronics, automotive, aerospace, and other industries. The industrial complex includes a chemical-metallurgical plant whose chlorination subproject required robust multidisciplinary engineering, risk analysis, and strong site support to ensure safe construction, commissioning, and long-term operation.

Other News