Featured project
CUPROCHLOR® RECOVERY OPTIMIZATION FOR SECONDARY SULFIDES – MINERA ZALDÍVAR
Industrial Sector
Mining
Client
Antofagasta Minerals
Location
It is 3,000 meters above sea level, 175 kilometers southeast of the Antofagasta City, Region II.
Date
2018-2020
Service Area
Consulting & Engineering
Solutions
Feasibility study, basic and detailed engineering, 3D modelling applied to BIM methodology, Capex, factory inspection and on-site engineering.
The Project consisted of modifying the infrastructure in the plant to introduce a leaching process with high chlorine content, using the Cuprochlor® technology, which Antofagasta Minerals has been using for some years, allowing to improve the recovery of sulphide minerals that exist in the deposit and that are part of its base case. These sulphide, by the conventional leaching method in an acid medium, reach an average recovery between the ranges of 50% to 55%; With this technology, it is projected to reach values in ranges above 70%.
Other News
Featured project
Enhancement of the Flash Furnace, Chuquicamata Smelter
Featured project
Construction of water management infrastructure
Featured project
PLYWOOD PLANT EXPANSION
Featured project
Overhaul of acid plants of the Chuquicamata Smelter
Featured project
Cerro Pabellón 3 Geothermal Plant


