Featured project

Expansion S/E Curacautín

6 of April of 2026

Industrial Sector


Energy

Client


CGE Transmisión

Location


Curacautín, Malleco Province, Araucanía Region

Date


2022

Service Area


Project Management

Solutions


Team - PMO, which includes planning and control, contract management, document control, counterparty and on-site engineering and environmental consulting

The project consisted of the replacement of the two 66/13.2 kV and 2.6 MVA transformers with a new 15 MVA equipment. It included the reuse of existing equipment, the extension of the 66 kV busbar, an extension of the 13.2 kV busbar in at least two positions for future feeders and the necessary civil works. It also included the necessary works for the Commissioning, such as adaptation of the protections, SCADA, civil works, assembly, earthing mesh, tests of the new equipment, and adaptations in the medium voltage yard, among others.

PA Engineering established the management team of this project through a management PMO to ensure its proper development. The work of the PMO that took charge of the project ranged from its basic and detailed engineering stage, obtaining building permits, environmental permits, supplies, construction and assembly, Commissioning and until the Entry into Operation of the new facility, which was achieved on August 25, 2022.