Featured project
PLYWOOD PLANT EXPANSION
Industrial Sector
Wood Products
Client
CMPC Maderas
Location
Mininco, Province of Malleco in the Araucanía Region
Date
2011- 2013
Service Area
EPCM Solutions
Solutions
Basic and detail engineering, equipment and materials acquisitions, construction administration and technical inspection of works. That is, an EPCM, which, on this occasion, was defined with Target Price, with the commitment of PA Engineering not to exceed the Capex and a deadline for development, defined in common agreement with the client.
In mid-2011, the management of CMPC Maderas’ Plywood plant requested support to estimate the investment involved in expanding its facilities to double its production, going from 240,000 m3 to 500,000 m3 of panels per year without stopping its operation, and to incorporate new technologies to optimize its processes and the efficient use of energy. This is how PA Engineering takes on the challenge, but with an extra ingredient, to carry out the task under the demands and commitment involved in carrying out an EPCM Target Price.
In the first stage of the project, and with the intention of estimating the investment to carry out the transformation of Plywood, a group of PA Engineering professionals worked on the basic engineering.
In May 2012, the second stage of the project began, the development of detailed engineering in mechanics, piping, civil and structures, electricity and instrumentation and control, which implied not only the expansion of the plant on its four sides, but also the redesign and expansion of the by-product handling areas. the steam networks, compressed air, fire network, sewage treatment plant and electrical system.
As the detailed engineering progressed, advances began in the procurement, in order to begin construction, all under strict control of compliance with deadlines and Capex and without interfering with the normal operating schedule of the plant.
The expansion project to increase production from 240,000 m3/year to 500,000 m3/year of finished plywood, also included the expansion of the industrial warehouse by 31 thousand m2, expansion of the office building, doubling the storage capacity of the piece yard, incorporating an additional unwinding line with its respective by-product handling area, two dryers, an additional joining machine, two automatic gluing and arming lines, two cold presses and two hot presses, and in the finishing area, two automatic panel repair lines and a new squaring and sanding line were incorporated. Additionally, a line was installed to provide greater added value to the panels (texturing, profiling and grooving).
Along with this, the pending areas of the original project were carried out: paving of interior roads, warehouse buildings, spare parts, maintenance workshops, quality control laboratory, dressing rooms, casino, operations and administration offices.
Other News
Featured project
Supervision for Pipeline Works
Featured project
PRODUCTION OMEGA 3 PLANT
Featured project
Electromechanical works and monitoring and control system construction project IX phase Talabre dam
Featured project
Tolpán Sur Wind Farm
Featured project
PtX E-Fuel Project, Haru Oni Demonstration Plant
Featured project
Pit Dewatering