Featured project
New Mejillones LPG Terminal
Industrial Sector
Oil & Gas
Client
Oxiquim
Location
Mejillones, located 65 kilometers north of the city of Antofagasta, in the province and region of the same name
Date
2019-2021
Service Area
Engineering & Project Management
Solutions
Review of basic engineering, detailed engineering in civil, mechanical, electrical and control disciplines, cathodic protection and flare radiation studies
The project consisted of the detailed engineering design of a semi-refrigerated LPG storage terminal, consisting of a sphere of 10,000 m3, 2,000mts. of 12″ pipeline (800 meters underground and 1,200 meters underwater), 200,000 Kcal refrigeration system, island and truck loading pumps, fire protection system, flame and gas detection and auxiliary equipment (air compressor, backup generator, SSEE) as well as piping, valves and instruments.
In addition, PA Engineering services included project management, planning, supervision, inspection (mechanical and electro-instrumental ITO), quality assurance, procurement of equipment and materials, in conjunction with the client, document control and planning and control of the progress of the different subcontracts corresponding to the project.
The project considered an investment of US$ 27.5 million, which was completed to the satisfaction of the client in cost and time
The importance of the construction of this new terminal lies in the fact that, until now, all the liquefied gas that was distributed in the north was unloaded in the Valparaíso region, so the operation of Mejillones hopes to reduce vehicle traffic and contribute to the development and independence of the northern area.
At the beginning of April, the first ship with liquefied gas from the United States arrived after 11 days of navigation, thus inaugurating the activities of the Oxiquim Mejillones Maritime Terminal.
Thanks to the LPG project, it will be possible to receive ships from different parts of the world, generating an energy independence that previously only existed in the centre of the country.
Other News
Featured project
Aguas Pacífico Multipurpose Desalination Plant
Featured project
Cerro Pabellón 3 Geothermal Plant
Featured project
Construction of water management infrastructure
Featured project
Electromechanical works and monitoring and control system construction project IX phase Talabre dam
Featured project
Tolpán Sur Wind Farm