{"id":1505,"date":"2026-04-06T17:59:53","date_gmt":"2026-04-06T20:59:53","guid":{"rendered":"https:\/\/pya.cl\/en\/?p=1505"},"modified":"2026-10-26T17:06:41","modified_gmt":"2026-10-26T20:06:41","slug":"2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining","status":"publish","type":"post","link":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/","title":{"rendered":"2\u00b0 and 3\u00b0 20,000 ton\/d crushing line for Antofagasta Minerals Centinela mining"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In 2014, Minera Centinela, an operation of Antofagasta Minerals, was faced with the need to eliminate one of the bottlenecks that prevented its concentrator from operating at nominal capacity, i.e., 100 thousand tons per day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The proposed solution was to carry out an EPC project to build a secondary and tertiary crushing plant in parallel to the existing line, so that it will process the difference of approximately 20 thousand tons per day and will feed directly to the ball mills that have the available grinding capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Within this EPC, PA Engineering performed the construction management, part of the engineering and the supply of the related materials and equipment. The scope of the engineering included the complete civil works of the project, the piping engineering, including the fire protection network, the piping and the electrical, instrumentation and control interconnection, as well as the processing of sectorial permits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During 2015, this project came into operation, which allowed the concentrator plant to reach its design capacity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2014, Minera Centinela, an operation of Antofagasta Minerals, was faced with the need to eliminate one of the bottlenecks that prevented its concentrator from operating at nominal capacity, i.e., 100 thousand tons per day. The proposed solution was to carry out an EPC project to build a secondary and tertiary crushing plant in parallel [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-1505","post","type-post","status-publish","format-standard","hentry","category-featured-project"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Crushing Line for Minera Centinela | Pares&amp;Alvarez<\/title>\n<meta name=\"description\" content=\"Engineering and construction management for the 20,000 ton\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Crushing Line for Minera Centinela | Pares&amp;Alvarez\" \/>\n<meta property=\"og:description\" content=\"Engineering and construction management for the 20,000 ton\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/\" \/>\n<meta property=\"og:site_name\" content=\"Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/paresyalvarezingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-06T20:59:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T20:06:41+00:00\" \/>\n<meta name=\"author\" content=\"danielafreire\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"danielafreire\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/\"},\"author\":{\"name\":\"danielafreire\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/2f69019292a192642f76dba93aeaebb9\"},\"headline\":\"2\u00b0 and 3\u00b0 20,000 ton\\\/d crushing line for Antofagasta Minerals Centinela mining\",\"datePublished\":\"2026-04-06T20:59:53+00:00\",\"dateModified\":\"2026-10-26T20:06:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/\"},\"wordCount\":171,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"articleSection\":[\"Featured project\"],\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/\",\"name\":\"Crushing Line for Minera Centinela | Pares&Alvarez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\"},\"datePublished\":\"2026-04-06T20:59:53+00:00\",\"dateModified\":\"2026-10-26T20:06:41+00:00\",\"description\":\"Engineering and construction management for the 20,000 ton\\\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2026\\\/04\\\/06\\\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/pya.cl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2\u00b0 and 3\u00b0 20,000 ton\\\/d crushing line for Antofagasta Minerals Centinela mining\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pya.cl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"width\":710,\"height\":502,\"caption\":\"Pares&Alvarez, Engineering and Projects\"},\"image\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/paresyalvarezingenieria\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pares-y-alvarez\\\/\",\"https:\\\/\\\/www.instagram.com\\\/paresyalvarez\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCZgTekrRq9LZgGXE8hxMxkw\\\/featured\",\"https:\\\/\\\/podcasters.spotify.com\\\/pod\\\/show\\\/paresalvarez\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/2f69019292a192642f76dba93aeaebb9\",\"name\":\"danielafreire\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"caption\":\"danielafreire\"},\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/author\\\/danielafreire\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Crushing Line for Minera Centinela | Pares&Alvarez","description":"Engineering and construction management for the 20,000 ton\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/","og_locale":"es_ES","og_type":"article","og_title":"Crushing Line for Minera Centinela | Pares&Alvarez","og_description":"Engineering and construction management for the 20,000 ton\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.","og_url":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/","og_site_name":"Pares&amp;Alvarez, Engineering and Projects","article_publisher":"https:\/\/www.facebook.com\/paresyalvarezingenieria","article_published_time":"2026-04-06T20:59:53+00:00","article_modified_time":"2026-10-26T20:06:41+00:00","author":"danielafreire","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"danielafreire","Tiempo estimado de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/#article","isPartOf":{"@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/"},"author":{"name":"danielafreire","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/2f69019292a192642f76dba93aeaebb9"},"headline":"2\u00b0 and 3\u00b0 20,000 ton\/d crushing line for Antofagasta Minerals Centinela mining","datePublished":"2026-04-06T20:59:53+00:00","dateModified":"2026-10-26T20:06:41+00:00","mainEntityOfPage":{"@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/"},"wordCount":171,"commentCount":0,"publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"articleSection":["Featured project"],"inLanguage":"es-CL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/","url":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/","name":"Crushing Line for Minera Centinela | Pares&Alvarez","isPartOf":{"@id":"https:\/\/pya.cl\/en\/#website"},"datePublished":"2026-04-06T20:59:53+00:00","dateModified":"2026-10-26T20:06:41+00:00","description":"Engineering and construction management for the 20,000 ton\/d secondary and tertiary crushing lines at Minera Centinela, in operation since 2015.","breadcrumb":{"@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pya.cl\/en\/2026\/04\/06\/2-and-3-20000-ton-d-crushing-line-for-antofagasta-minerals-centinela-mining\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/pya.cl\/en\/"},{"@type":"ListItem","position":2,"name":"2\u00b0 and 3\u00b0 20,000 ton\/d crushing line for Antofagasta Minerals Centinela mining"}]},{"@type":"WebSite","@id":"https:\/\/pya.cl\/en\/#website","url":"https:\/\/pya.cl\/en\/","name":"Pares&Alvarez, Engineering and Projects","description":"","publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pya.cl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/pya.cl\/en\/#organization","name":"Pares&Alvarez, Engineering and Projects","url":"https:\/\/pya.cl\/en\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","contentUrl":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","width":710,"height":502,"caption":"Pares&Alvarez, Engineering and Projects"},"image":{"@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/paresyalvarezingenieria","https:\/\/www.linkedin.com\/company\/pares-y-alvarez\/","https:\/\/www.instagram.com\/paresyalvarez\/","https:\/\/www.youtube.com\/channel\/UCZgTekrRq9LZgGXE8hxMxkw\/featured","https:\/\/podcasters.spotify.com\/pod\/show\/paresalvarez"]},{"@type":"Person","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/2f69019292a192642f76dba93aeaebb9","name":"danielafreire","image":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","caption":"danielafreire"},"url":"https:\/\/pya.cl\/en\/author\/danielafreire\/"}]}},"_links":{"self":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/comments?post=1505"}],"version-history":[{"count":1,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1505\/revisions"}],"predecessor-version":[{"id":1510,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1505\/revisions\/1510"}],"wp:attachment":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/media?parent=1505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/categories?post=1505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/tags?post=1505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}