{"id":1258,"date":"2025-09-11T10:44:00","date_gmt":"2025-09-11T13:44:00","guid":{"rendered":"https:\/\/pya.cl\/en\/?p=1258"},"modified":"2026-04-02T10:57:27","modified_gmt":"2026-04-02T13:57:27","slug":"environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved","status":"publish","type":"post","link":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/","title":{"rendered":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved"},"content":{"rendered":"\n<p>Pares&amp;Alvarez (P&amp;A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.<\/p>\n\n\n\n<p>The project, titled \u201cGreen Hydrogen Production for the Antofagasta Mining District\u201d by H2 Green Mining\u2014a joint venture between Susterra and Star Energy Partners\u2014aims to produce green hydrogen (H2V) to reduce the mining industry\u2019s carbon footprint by replacing the use of fossil fuels in smelting, refining, transportation, and thermal processes. The initial phase calls for an electrolysis capacity of 40 MW, with a projected expansion to a total of 200 MW, and the plant is expected to produce 70 tons of green hydrogen per day, with a potential reduction of up to 200,000 metric tons of CO\u2082 equivalent per year.<\/p>\n\n\n\n<p>The Consulting Division of Pares&amp;Alvarez developed the conceptual engineering for the project, which formed the basis of the environmental analysis. The study covered the plant\u2019s design, including its technology and planned expansions over time, as well as all the service infrastructure required for its operation and control. To achieve an optimal design, contacts were established with leading suppliers of reverse osmosis, electrolysis, storage and charging systems, tube trailers, electrical and refrigeration systems, among others, thereby defining the most suitable design and projected production capacities. All this work was carried out in compliance with the highest national and international regulatory standards (NFPA 2, DS 13\/2024, DS No. 43\/2016, DS No. 148\/2004, NEC, IEEE).<\/p>\n\n\n\n<p>The study also included volume calculations, construction scheduling projections, and an execution and constructability plan, ensuring that the project has a solid technical roadmap. This conceptual engineering was essential for defining the area of influence, its description, and the technical information required for the Sectoral Environmental Permits (PAS), elements incorporated into the environmental document that was developed, managed, and submitted to the Environmental Impact Assessment System (SEIA).<\/p>\n\n\n\n<p>\u201cThis milestone reflect the synergy between our Engineering, Consulting, and Environment divisions, and solidifies Pares&amp;Alvarez as a strategic partner for clean energy and sustainable mining projects,\u201d noted Claudia Goza, Environment Manager at P&amp;A.<\/p>\n\n\n\n<p>The Antofagasta Green Hydrogen Plant represents a key step in the decarbonization of Chilean mining and reinforces Pares&amp;Alvarez\u2019s commitment to innovation, sustainability, and the energy transition.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pares&amp;Alvarez (P&amp;A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district. The project, titled \u201cGreen Hydrogen Production for the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-1258","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects<\/title>\n<meta name=\"description\" content=\"Pares&amp;Alvarez (P&amp;A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"og:description\" content=\"Pares&amp;Alvarez (P&amp;A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/\" \/>\n<meta property=\"og:site_name\" content=\"Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/paresyalvarezingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-11T13:44:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-02T13:57:27+00:00\" \/>\n<meta name=\"author\" content=\"danielafreire\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"danielafreire\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/\"},\"author\":{\"name\":\"danielafreire\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/2f69019292a192642f76dba93aeaebb9\"},\"headline\":\"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved\",\"datePublished\":\"2025-09-11T13:44:00+00:00\",\"dateModified\":\"2026-04-02T13:57:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/\"},\"wordCount\":415,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"articleSection\":[\"News\"],\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/\",\"name\":\"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\"},\"datePublished\":\"2025-09-11T13:44:00+00:00\",\"dateModified\":\"2026-04-02T13:57:27+00:00\",\"description\":\"Pares&Alvarez (P&A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2025\\\/09\\\/11\\\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/pya.cl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pya.cl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"width\":710,\"height\":502,\"caption\":\"Pares&Alvarez, Engineering and Projects\"},\"image\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/paresyalvarezingenieria\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pares-y-alvarez\\\/\",\"https:\\\/\\\/www.instagram.com\\\/paresyalvarez\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCZgTekrRq9LZgGXE8hxMxkw\\\/featured\",\"https:\\\/\\\/podcasters.spotify.com\\\/pod\\\/show\\\/paresalvarez\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/2f69019292a192642f76dba93aeaebb9\",\"name\":\"danielafreire\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g\",\"caption\":\"danielafreire\"},\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/author\\\/danielafreire\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects","description":"Pares&Alvarez (P&A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/","og_locale":"es_ES","og_type":"article","og_title":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects","og_description":"Pares&Alvarez (P&A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.","og_url":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/","og_site_name":"Pares&amp;Alvarez, Engineering and Projects","article_publisher":"https:\/\/www.facebook.com\/paresyalvarezingenieria","article_published_time":"2025-09-11T13:44:00+00:00","article_modified_time":"2026-04-02T13:57:27+00:00","author":"danielafreire","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"danielafreire","Tiempo estimado de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/#article","isPartOf":{"@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/"},"author":{"name":"danielafreire","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/2f69019292a192642f76dba93aeaebb9"},"headline":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved","datePublished":"2025-09-11T13:44:00+00:00","dateModified":"2026-04-02T13:57:27+00:00","mainEntityOfPage":{"@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/"},"wordCount":415,"commentCount":0,"publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"articleSection":["News"],"inLanguage":"es-CL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/","url":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/","name":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved - Pares&amp;Alvarez, Engineering and Projects","isPartOf":{"@id":"https:\/\/pya.cl\/en\/#website"},"datePublished":"2025-09-11T13:44:00+00:00","dateModified":"2026-04-02T13:57:27+00:00","description":"Pares&Alvarez (P&A), an engineering company with extensive experience in mining and energy projects, announced that its Environmental Department successfully led the process of preparing and obtaining approval for the Environmental Impact Statement (EIS) for the Green Hydrogen Plant project to be located in the Antofagasta mining district.","breadcrumb":{"@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pya.cl\/en\/2025\/09\/11\/environmental-assessment-led-by-pa-for-a-green-hydrogen-project-for-the-mining-industry-in-calama-has-been-approved\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/pya.cl\/en\/"},{"@type":"ListItem","position":2,"name":"Environmental assessment led by P&amp;A for a green hydrogen project for the mining industry in Calama has been approved"}]},{"@type":"WebSite","@id":"https:\/\/pya.cl\/en\/#website","url":"https:\/\/pya.cl\/en\/","name":"Pares&Alvarez, Engineering and Projects","description":"","publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pya.cl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/pya.cl\/en\/#organization","name":"Pares&Alvarez, Engineering and Projects","url":"https:\/\/pya.cl\/en\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","contentUrl":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","width":710,"height":502,"caption":"Pares&Alvarez, Engineering and Projects"},"image":{"@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/paresyalvarezingenieria","https:\/\/www.linkedin.com\/company\/pares-y-alvarez\/","https:\/\/www.instagram.com\/paresyalvarez\/","https:\/\/www.youtube.com\/channel\/UCZgTekrRq9LZgGXE8hxMxkw\/featured","https:\/\/podcasters.spotify.com\/pod\/show\/paresalvarez"]},{"@type":"Person","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/2f69019292a192642f76dba93aeaebb9","name":"danielafreire","image":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4a6302282a737bcfcadfca45a747f838c3280b8a4194d19f15c93beccb36b751?s=96&d=mm&r=g","caption":"danielafreire"},"url":"https:\/\/pya.cl\/en\/author\/danielafreire\/"}]}},"_links":{"self":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/comments?post=1258"}],"version-history":[{"count":1,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1258\/revisions"}],"predecessor-version":[{"id":1260,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1258\/revisions\/1260"}],"wp:attachment":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/media?parent=1258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/categories?post=1258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/tags?post=1258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}