{"id":1099,"date":"2024-04-30T18:17:00","date_gmt":"2024-04-30T21:17:00","guid":{"rendered":"https:\/\/pya.cl\/en\/?p=1099"},"modified":"2025-10-16T12:25:40","modified_gmt":"2025-10-16T15:25:40","slug":"agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining","status":"publish","type":"post","link":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/","title":{"rendered":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining"},"content":{"rendered":"\n<p>In 2005, the construction of the Spence Mining Company began and two years later it started production, consolidating itself over time as a relevant deposit in BHP&#8217;s investment portfolio.<\/p>\n\n\n\n<p>In August 2017, BHP approved the Spence Growth Option (SGO) project, with an estimated investment of US$2.46 million, which was aligned with the mining company&#8217;s corporate strategy of having large, long-lived and low-cost operations.<\/p>\n\n\n\n<p>With this, the site took a big step thanks to the construction of the SGO project, which allows Spence to project itself in the long term through the treatment of hypogene minerals through a concentrator plant, which operates in conjunction with the current FullSal mixed mineral leaching process.<\/p>\n\n\n\n<p>Overall, the project comprised a new 95,000 tpd concentrator plant, extending the life of the Spence mine by more than 50 years, and the commissioning of the desalination plant.<\/p>\n\n\n\n<p>The desalination plant, which considers the use of seawater for 100% of the mining process, uses reverse osmosis technology and has an approximate capacity of 1,000 l\/s of water and required 154 km of water piping from the plant to the mine operation.<\/p>\n\n\n\n<p>Pares&amp;Alvarez developed basic and detailed engineering in instrumentation and control, electrical, civil-structural, mechanical and piping, among others, architectural design, 3D technology, procurement and on-site engineering.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2005, the construction of the Spence Mining Company began and two years later it started production, consolidating itself over time as a relevant deposit in BHP&#8217;s investment portfolio. In August 2017, BHP approved the Spence Growth Option (SGO) project, with an estimated investment of US$2.46 million, which was aligned with the mining company&#8217;s corporate [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-1099","post","type-post","status-publish","format-standard","hentry","category-featured-project"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"og:description\" content=\"In 2005, the construction of the Spence Mining Company began and two years later it started production, consolidating itself over time as a relevant deposit in BHP&#8217;s investment portfolio. In August 2017, BHP approved the Spence Growth Option (SGO) project, with an estimated investment of US$2.46 million, which was aligned with the mining company&#8217;s corporate [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/\" \/>\n<meta property=\"og:site_name\" content=\"Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/paresyalvarezingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-30T21:17:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-16T15:25:40+00:00\" \/>\n<meta name=\"author\" content=\"mariaibanez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"mariaibanez\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/\"},\"author\":{\"name\":\"mariaibanez\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/0531e898b186877cdb514bdbf23274de\"},\"headline\":\"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining\",\"datePublished\":\"2024-04-30T21:17:00+00:00\",\"dateModified\":\"2025-10-16T15:25:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/\"},\"wordCount\":219,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"articleSection\":[\"Featured project\"],\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/\",\"name\":\"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\"},\"datePublished\":\"2024-04-30T21:17:00+00:00\",\"dateModified\":\"2025-10-16T15:25:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/04\\\/30\\\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/pya.cl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pya.cl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"width\":710,\"height\":502,\"caption\":\"Pares&Alvarez, Engineering and Projects\"},\"image\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/paresyalvarezingenieria\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pares-y-alvarez\\\/\",\"https:\\\/\\\/www.instagram.com\\\/paresyalvarez\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCZgTekrRq9LZgGXE8hxMxkw\\\/featured\",\"https:\\\/\\\/podcasters.spotify.com\\\/pod\\\/show\\\/paresalvarez\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/0531e898b186877cdb514bdbf23274de\",\"name\":\"mariaibanez\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"caption\":\"mariaibanez\"},\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/author\\\/mariaibanez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/","og_locale":"es_ES","og_type":"article","og_title":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects","og_description":"In 2005, the construction of the Spence Mining Company began and two years later it started production, consolidating itself over time as a relevant deposit in BHP&#8217;s investment portfolio. In August 2017, BHP approved the Spence Growth Option (SGO) project, with an estimated investment of US$2.46 million, which was aligned with the mining company&#8217;s corporate [&hellip;]","og_url":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/","og_site_name":"Pares&amp;Alvarez, Engineering and Projects","article_publisher":"https:\/\/www.facebook.com\/paresyalvarezingenieria","article_published_time":"2024-04-30T21:17:00+00:00","article_modified_time":"2025-10-16T15:25:40+00:00","author":"mariaibanez","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"mariaibanez","Tiempo estimado de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/#article","isPartOf":{"@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/"},"author":{"name":"mariaibanez","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/0531e898b186877cdb514bdbf23274de"},"headline":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining","datePublished":"2024-04-30T21:17:00+00:00","dateModified":"2025-10-16T15:25:40+00:00","mainEntityOfPage":{"@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/"},"wordCount":219,"commentCount":0,"publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"articleSection":["Featured project"],"inLanguage":"es-CL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/","url":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/","name":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining - Pares&amp;Alvarez, Engineering and Projects","isPartOf":{"@id":"https:\/\/pya.cl\/en\/#website"},"datePublished":"2024-04-30T21:17:00+00:00","dateModified":"2025-10-16T15:25:40+00:00","breadcrumb":{"@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pya.cl\/en\/2024\/04\/30\/agua-de-mar-desalination-plant-spence-growth-option-sgo-project-bhp-spence-mining\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/pya.cl\/en\/"},{"@type":"ListItem","position":2,"name":"Agua de Mar Desalination Plant, Spence Growth Option (SGO) project, BHP Spence Mining"}]},{"@type":"WebSite","@id":"https:\/\/pya.cl\/en\/#website","url":"https:\/\/pya.cl\/en\/","name":"Pares&Alvarez, Engineering and Projects","description":"","publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pya.cl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/pya.cl\/en\/#organization","name":"Pares&Alvarez, Engineering and Projects","url":"https:\/\/pya.cl\/en\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","contentUrl":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","width":710,"height":502,"caption":"Pares&Alvarez, Engineering and Projects"},"image":{"@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/paresyalvarezingenieria","https:\/\/www.linkedin.com\/company\/pares-y-alvarez\/","https:\/\/www.instagram.com\/paresyalvarez\/","https:\/\/www.youtube.com\/channel\/UCZgTekrRq9LZgGXE8hxMxkw\/featured","https:\/\/podcasters.spotify.com\/pod\/show\/paresalvarez"]},{"@type":"Person","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/0531e898b186877cdb514bdbf23274de","name":"mariaibanez","image":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","caption":"mariaibanez"},"url":"https:\/\/pya.cl\/en\/author\/mariaibanez\/"}]}},"_links":{"self":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/comments?post=1099"}],"version-history":[{"count":3,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1099\/revisions"}],"predecessor-version":[{"id":1150,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1099\/revisions\/1150"}],"wp:attachment":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/media?parent=1099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/categories?post=1099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/tags?post=1099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}