{"id":1097,"date":"2024-11-11T17:58:00","date_gmt":"2024-11-11T20:58:00","guid":{"rendered":"https:\/\/pya.cl\/en\/?p=1097"},"modified":"2026-10-27T12:02:59","modified_gmt":"2026-10-27T15:02:59","slug":"electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam","status":"publish","type":"post","link":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/","title":{"rendered":"Electromechanical works and monitoring and control system construction project IX phase Talabre dam"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Talabre Dam, located in the Chuquicamata mining district, is currently in operation in its Stage VIII of growth, with a final capacity of 1,451 Mm3. The operation of the dam includes the gradual growth of the perimeter walls, which are designed to the highest standards to meet the demand for tailings storage. An upcoming expansion of the perimeter walls called Construction IX stage Talabre dam is projected, which will operate until 2030, reaching a final capacity of 1,771 Mm3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through a tender, Codelco&#8217;s Vice Presidency has awarded PA Engineering the development of the detailed engineering for several systems of the Construction IX Phase Talabre Dam project. These include the Tailings Conduction and Deposit System, the Water Recovery and Recirculation System, the Hydraulic Barrier, the Electric Supply, and the Centralized Monitoring and Control. The designs are being carried out using BIM and Advanced Work Packaging (AWP) methodologies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project foresees an increase of 320 million cubic meters in the tailings storage capacity of the Ministro Hales and Chuquicamata divisions, which will imply the growth of the perimeter walls of the Talabre Dam, raising the level from 2496 meters above sea level to 2500 meters above sea level.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Talabre Dam, located in the Chuquicamata mining district, is currently in operation in its Stage VIII of growth, with a final capacity of 1,451 Mm3. The operation of the dam includes the gradual growth of the perimeter walls, which are designed to the highest standards to meet the demand for tailings storage. An upcoming [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-1097","post","type-post","status-publish","format-standard","hentry","category-featured-project"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Talabre Tailings Dam IX Phase: Detailed Engineering | P&amp;A<\/title>\n<meta name=\"description\" content=\"Pares&amp;Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Talabre Tailings Dam IX Phase: Detailed Engineering | P&amp;A\" \/>\n<meta property=\"og:description\" content=\"Pares&amp;Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/\" \/>\n<meta property=\"og:site_name\" content=\"Pares&amp;Alvarez, Engineering and Projects\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/paresyalvarezingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-11T20:58:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T15:02:59+00:00\" \/>\n<meta name=\"author\" content=\"mariaibanez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"mariaibanez\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/\"},\"author\":{\"name\":\"mariaibanez\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/0531e898b186877cdb514bdbf23274de\"},\"headline\":\"Electromechanical works and monitoring and control system construction project IX phase Talabre dam\",\"datePublished\":\"2024-11-11T20:58:00+00:00\",\"dateModified\":\"2026-10-27T15:02:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/\"},\"wordCount\":205,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"articleSection\":[\"Featured project\"],\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/\",\"name\":\"Talabre Tailings Dam IX Phase: Detailed Engineering | P&A\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\"},\"datePublished\":\"2024-11-11T20:58:00+00:00\",\"dateModified\":\"2026-10-27T15:02:59+00:00\",\"description\":\"Pares&Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/2024\\\/11\\\/11\\\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/pya.cl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electromechanical works and monitoring and control system construction project IX phase Talabre dam\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pya.cl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#organization\",\"name\":\"Pares&Alvarez, Engineering and Projects\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/pya.cl\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/10\\\/logo.png\",\"width\":710,\"height\":502,\"caption\":\"Pares&Alvarez, Engineering and Projects\"},\"image\":{\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/paresyalvarezingenieria\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pares-y-alvarez\\\/\",\"https:\\\/\\\/www.instagram.com\\\/paresyalvarez\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCZgTekrRq9LZgGXE8hxMxkw\\\/featured\",\"https:\\\/\\\/podcasters.spotify.com\\\/pod\\\/show\\\/paresalvarez\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pya.cl\\\/en\\\/#\\\/schema\\\/person\\\/0531e898b186877cdb514bdbf23274de\",\"name\":\"mariaibanez\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g\",\"caption\":\"mariaibanez\"},\"url\":\"https:\\\/\\\/pya.cl\\\/en\\\/author\\\/mariaibanez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Talabre Tailings Dam IX Phase: Detailed Engineering | P&A","description":"Pares&Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/","og_locale":"es_ES","og_type":"article","og_title":"Talabre Tailings Dam IX Phase: Detailed Engineering | P&A","og_description":"Pares&Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.","og_url":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/","og_site_name":"Pares&amp;Alvarez, Engineering and Projects","article_publisher":"https:\/\/www.facebook.com\/paresyalvarezingenieria","article_published_time":"2024-11-11T20:58:00+00:00","article_modified_time":"2026-10-27T15:02:59+00:00","author":"mariaibanez","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"mariaibanez","Tiempo estimado de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/#article","isPartOf":{"@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/"},"author":{"name":"mariaibanez","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/0531e898b186877cdb514bdbf23274de"},"headline":"Electromechanical works and monitoring and control system construction project IX phase Talabre dam","datePublished":"2024-11-11T20:58:00+00:00","dateModified":"2026-10-27T15:02:59+00:00","mainEntityOfPage":{"@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/"},"wordCount":205,"commentCount":0,"publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"articleSection":["Featured project"],"inLanguage":"es-CL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/","url":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/","name":"Talabre Tailings Dam IX Phase: Detailed Engineering | P&A","isPartOf":{"@id":"https:\/\/pya.cl\/en\/#website"},"datePublished":"2024-11-11T20:58:00+00:00","dateModified":"2026-10-27T15:02:59+00:00","description":"Pares&Alvarez develops detailed engineering with BIM and AWP for Codelco\u2019s Talabre tailings dam IX phase: 320 Mm\u00b3 of added storage in Calama, Chile.","breadcrumb":{"@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pya.cl\/en\/2024\/11\/11\/electromechanical-works-and-monitoring-and-control-system-construction-project-ix-phase-talabre-dam\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/pya.cl\/en\/"},{"@type":"ListItem","position":2,"name":"Electromechanical works and monitoring and control system construction project IX phase Talabre dam"}]},{"@type":"WebSite","@id":"https:\/\/pya.cl\/en\/#website","url":"https:\/\/pya.cl\/en\/","name":"Pares&Alvarez, Engineering and Projects","description":"","publisher":{"@id":"https:\/\/pya.cl\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pya.cl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/pya.cl\/en\/#organization","name":"Pares&Alvarez, Engineering and Projects","url":"https:\/\/pya.cl\/en\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","contentUrl":"https:\/\/pya.cl\/en\/wp-content\/uploads\/sites\/2\/2024\/10\/logo.png","width":710,"height":502,"caption":"Pares&Alvarez, Engineering and Projects"},"image":{"@id":"https:\/\/pya.cl\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/paresyalvarezingenieria","https:\/\/www.linkedin.com\/company\/pares-y-alvarez\/","https:\/\/www.instagram.com\/paresyalvarez\/","https:\/\/www.youtube.com\/channel\/UCZgTekrRq9LZgGXE8hxMxkw\/featured","https:\/\/podcasters.spotify.com\/pod\/show\/paresalvarez"]},{"@type":"Person","@id":"https:\/\/pya.cl\/en\/#\/schema\/person\/0531e898b186877cdb514bdbf23274de","name":"mariaibanez","image":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1aa16226b14f480f305a60e13c85382131733070938259afae2f2358e3e6c397?s=96&d=mm&r=g","caption":"mariaibanez"},"url":"https:\/\/pya.cl\/en\/author\/mariaibanez\/"}]}},"_links":{"self":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/comments?post=1097"}],"version-history":[{"count":1,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1097\/revisions"}],"predecessor-version":[{"id":1098,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/posts\/1097\/revisions\/1098"}],"wp:attachment":[{"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/media?parent=1097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/categories?post=1097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pya.cl\/en\/wp-json\/wp\/v2\/tags?post=1097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}